  1. 1

    Check whether the problem gives a linear objective with an uncertainty ball (radius r) or a chance-constrained model (risk level \alpha).

    • linear ball model, objective coefficient vector c and radius r — go to Step 2.
    • chance-constrained model (Sections 8-9) — skip to Step 4; cost is capacity minus nominal, with no \|c\| involved.

    Why: the two models this chapter builds price robustness through different formulas, even though both measure the same idea, a gap from the nominal value.

  2. 2

    For the linear ball model, compute the norm of the objective's coefficient vector, \|c\|=\sqrt{c_1^2+c_2^2+\cdots}.

    Example

    c=(3,4): \|c\|=\sqrt{3^2+4^2}=\sqrt{25}=5.

    Why: \|c\| is exactly the constant of proportionality in \text{Cost}(r)=r\|c\| — how steeply this objective reacts to the direction uncertainty pushes it.

  3. 3

    Multiply: \text{Cost}(r)=r\|c\|.

    Example

    With \|c\|=5: \text{Cost}(1)=5, \text{Cost}(2)=10.

    Why: this is the chapter's own derived formula for the price of robustness under the linear ball model.

  4. 4

    Given a maximum affordable extra cost, set r\|c\|\le\text{budget} and solve for r.

    Example

    Budget =15, \|c\|=5: r\le15/5=3, so r=3 is the largest affordable radius.

    Why: since cost rises linearly in r, dividing the budget by the fixed rate \|c\| gives the largest radius the budget still covers.

  5. 5

    Compute the capacity at a chosen \alpha (Section 8's formula), then subtract the nominal baseline value.

    Example

    Demand uniform on [100,200], nominal 150: at \alpha=0.10, capacity 190, cost =190-150=40; at \alpha=0, capacity 200, cost =50.

    • the distribution is genuinely uniform — the rate stays constant, as in this chapter's models.
    • the distribution concentrates mass away from its tail (bell-shaped, for instance) — the rate is not guaranteed constant; treat a straight-line result as a property of this specific model, not a universal law.

    Why: this measures the same "extra cost for extra protection" idea as Steps 2-3, just through capacity instead of r\|c\|.

Common mistakes

  • Assuming every uncertainty model prices robustness on a straight line — that's a property of the ball and uniform models this chapter builds, not a universal law.
  • Forgetting that a larger \|c\| makes the exact same radius r more expensive — price depends on the objective's own sensitivity, not just the uncertainty size.
  • Mixing up the two models' formulas — dividing by \|c\| when working with chance-constrained capacity, or vice versa.
  • Treating \text{Cost}(r)\le\text{budget} as an equality only, missing that any smaller r is also affordable.