Skip to content
Free public beta until December 4, 2026: every course is open, no card needed. After that, the first chapter of each course stays free and full access is a one-time $39 ($19 for up to 100 founding members chosen for helpful feedback). Your progress is kept. How the beta works

halt condition

A rule written in advance that stops a rollout when too many devices fail.

A halt condition is a pre-agreed threshold on health signals, such as a failure rate per stage, that automatically stops a staged rollout from proceeding.

Examples

  • For the 160-device greenhouse fleet, the 4-device canary stage halts if 2 or more devices fail, a 25 % limit written before the rollout starts.

  • A device that took the release and hasn't reported within the soak time counts as a failure toward the halt condition, not a success.

Read the full section →